AV无码骚逼被大鸡巴插,逼逼爱插插18,日韩又色又刺激的免费视频,国产黄色a三级三级三级

歡迎進(jìn)入山東恒能環(huán)保能源設(shè)備有限公司

熱線電話

0531-69953988

分類導(dǎo)航
產(chǎn)品展示
聯(lián)系我們
山東恒能環(huán)保能源設(shè)備有限公司

聯(lián)系電話:18678860671

服務(wù)熱線:0531-69953988

聯(lián)系地址:中國(guó)(山東)自由貿(mào)易試驗(yàn)區(qū)濟(jì)南片區(qū)孫村街道經(jīng)十東路33688號(hào)章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號(hào)樓 101

沼氣凈化脫硫裝置的運(yùn)行維護(hù)!

沼氣凈化裝置的運(yùn)行維護(hù)應(yīng)符合下列規(guī)定:

The operation and maintenance of biogas purification device shall meet the following requirements:
1、應(yīng)定期排出脫水、脫硫裝置中的領(lǐng)凝水。當(dāng)室外溫度接近0℃時(shí),應(yīng)每天排除冷凝水,排水時(shí)應(yīng)防止沼氣泄漏。
1. The condensate water in dehydration and desulfurization unit shall be discharged regularly. When the outdoor temperature is close to 0 ℃, the condensate water should be drained every day, and the leakage of biogas should be prevented during drainage.
2、生物脫硫啟動(dòng)運(yùn)行正常后,應(yīng)定期檢查脫硫前后硫化氫濃度變化,硫化氫去除率應(yīng)滿足后端工藝要求。當(dāng)發(fā)現(xiàn)脫硫效率明顯下降時(shí),應(yīng)及時(shí)補(bǔ)充循環(huán)營(yíng)養(yǎng)液。塔內(nèi)填料應(yīng)6-12個(gè)月清洗1次。
2. After the start-up and operation of biological desulfurization are normal, the change of hydrogen sulfide concentration before and after desulfurization should be checked regularly, and the hydrogen sulfide removal rate should meet the requirements of back-end process. When it is found that the desulfurization efficiency is obviously decreased, the circulating nutrient solution should be supplemented in time. The packing in the tower should be cleaned once every 6-12 months.
3、應(yīng)定期檢查干法脫硫塔前后硫化氫濃度、沼氣壓力變化,當(dāng)達(dá)不到設(shè)計(jì)要求時(shí)應(yīng)更換脫硫劑或進(jìn)行脫硫再生。
3. The change of hydrogen sulfide concentration and biogas pressure before and after the dry desulfurization tower should be checked regularly. When the design requirements are not met, the desulfurizer should be replaced or the desulfurization regeneration should be carried out.
                       沼氣脫硫
4、干法脫硫塔再生應(yīng)符合下列規(guī)定:
4. Regeneration of dry desulfurization tower shall meet the following requirements:
1).當(dāng)采用塔內(nèi)脫硫劑再生時(shí),應(yīng)關(guān)閉沼氣進(jìn)出口閥,打開旁通管道和放散管路閥門。
1) When the desulfurizer in the tower is used for regeneration, the inlet and outlet valves of biogas should be closed, and the valves of bypass pipeline and discharge pipeline should be opened.
2).當(dāng)采用在線脫硫劑再生時(shí),應(yīng)根據(jù)沼氣中硫化氫含量確定空氣摻混量及空氣流速,塔內(nèi)溫度應(yīng)低于70℃,脫硫塔出口處沼氣中氧含量應(yīng)小于1%;
2) When online desulfurizer regeneration is used, the air mixing amount and air flow rate should be determined according to the content of hydrogen sulfide in biogas. The temperature in the tower should be lower than 70 ℃, and the oxygen content in biogas at the outlet of desulfurization tower should be less than 1%;
3).脫硫劑進(jìn)行2次~3次再生后應(yīng)及時(shí)更換,更換脫硫劑時(shí)操作人員應(yīng)戴防毒面具,室內(nèi)應(yīng)進(jìn)行通風(fēng);
3) The desulfurizer should be replaced in time after 2 ~ 3 times of regeneration. When replacing the desulfurizer, the operators should wear gas masks, and the room should be ventilated;
4).廢脫硫劑的處置應(yīng)符合環(huán)境保護(hù)的要求。
4) The disposal of waste desulfurizer should meet the requirements of environmental protection.

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃?xì)怏w凈化及利用行業(yè)
少妇高潮惨叫久久久久久久| 一本久久综合亚洲鲁鲁五月天| 波多野结衣在线视频| 波多野结衣乱码中文字幕| 双腿间已经湿成一片| 男女真人抽搐一进一出免费视频| 娇妻系列交换(纯肉高h)| 国产精品久久久久久吹潮| 国产99久久久国产精品~~牛| 久久精品中文字幕无码绿巨人| 女人被添全过程A片试看| 波多野结衣视频| 强开小婷嫩苞又嫩又紧视频| a片试看120分钟做受图片| 亲胸揉屁股膜下刺激视频| 无码少妇一区二区三区免费看| 亚洲AV无码成人黄网站在线观看| 一女被二男吃奶a片免费观看| 国产综合一区二区三区| 久热爱精品视频在线| 浪荡受np双性合集| 国产又爽又黄又爽又刺激| 99久久免费国产精品| 绝味儿媳妇TXT| 女人夜夜春高潮爽a∨片传媒| 和教官在教室做了好爽| 亚洲色欲啪啪久久www综合网| 孕妇被男狂揉吃奶胸高潮| 日木AV无码专区亚洲AV毛片| 曰曰摸日日碰夜夜爽歪歪| 国产尤物av尤物在线观看| 太深太粗太爽太猛了视频| 中文字幕人妻无码乱精品| 真空下楼取快递被C嗯啊| 人人妻人人爽人人澡欧美一区| 天天狠狠夜夜狠狠噜无码| 俄国一姐RAPPER潮水| 亚洲 都市 校园 激情 另类| 两男一女两根同进去舒服吗| 又大又粗又爽18禁免费看| 久久精品熟女亚洲AV色欲|