冷卻塔安裝要求

1.冷卻塔安裝要求

1. Installation requirements of cooling tower
(1)冷卻塔的安裝應根據(jù)設備的各種條件,考慮其安裝位置的地面及其荷載能力,同時也考慮外界條件。
(1) The installation of the cooling tower shall consider the ground and its load capacity at the installation location as well as the external conditions according to various equipment conditions.
(2)安裝時應注意冷卻塔的基礎按規(guī)定的尺寸預埋好水平鋼板,各基礎點的標高應在同一標高的水平面上。
(2) During installation, it shall be noted that the horizontal steel plate shall be embedded in the foundation of the cooling tower according to the specified size, and the elevation of each foundation point shall be on the horizontal plane of the same elevation.
(3)塔體應放置水平。水塔在施工安裝時,為防止壓壞底盤,施工人員應踏在底盤的加強筋上,在安裝塔外殼、底盤等纖維件時,為防止外殼底盤等變形可先穿螺釘,而后依次逐漸緊固,在確認底盤不變形,附近干凈、干燥的條件下,為避免使用時漏水可在接觸處鋪設纖維氈及涂樹脂。
(3) The tower body shall be placed horizontally. During the construction and installation of the water tower, in order to prevent crushing the chassis, the construction personnel should step on the reinforcing ribs of the chassis. When installing the tower shell, chassis and other fiber parts, in order to prevent the deformation of the shell and chassis, the screws can be threaded first, and then the screws can be tightened gradually. After confirming that the chassis is not deformed, and the surrounding area is clean and dry, the fiber felt and resin can be laid at the contact point to avoid water leakage during use.
2.冷卻塔本體安裝
2. Installation of cooling tower body
冷卻塔不得安裝在通風不良和出現(xiàn)濕空氣回流的場合,須安裝在通風良好的場所。否則將會降低冷卻塔的冷卻能力。冷卻塔一般安裝在冷凍站的屋頂上,以形成高壓頭,用以克服冷凝器的阻力損失。水泵將需要處理的冷卻水從水池抽出送至冷卻塔,經(jīng)冷卻降溫后從塔底集水盤向下自流壓入冷凝器中,并繼而靠水頭壓差自流入水池,如此循環(huán)。
The cooling tower shall not be installed in the place with poor ventilation and wet air return, but in the place with good ventilation. Otherwise, the cooling capacity of the cooling tower will be reduced. The cooling tower is generally installed on the roof of the refrigeration station to form a high-pressure head to overcome the resistance loss of the condenser. The water pump pumps the cooling water to be treated from the pool to the cooling tower. After cooling, it flows down from the water collecting tray at the bottom of the tower to the condenser automatically, and then flows into the pool automatically by the head pressure difference, so as to circulate.
安裝時,應根據(jù)施工圖指明的坐標位置就位,并應找平找正,設備要穩(wěn)定牢固,冷卻塔的出水管口及噴嘴方向、位置應正確。
During installation, it shall be in place according to the coordinate position indicated in the construction drawing, and shall be leveled and aligned. The equipment shall be stable and firm, and the direction and position of the water outlet and nozzle of the cooling tower shall be correct.

相關產(chǎn)品 我們的存在,是為了更好的服務于沼氣等可燃氣體凈化及利用行業(yè)
搡老女人搡老妇女XXXXHD| 无码人妻精品一区二区三区蜜臀| 无码八a片人妻少妇久久| 中文字幕人妻熟女人妻A片| 校花夹震蛋上课自慰爽死| 亲嘴脱内衣内裤摸屁股| 真实刺激交换娇妻13篇| 我的私人女教师3| 我的世界珍妮视频完整版在线观看| 妓院一钑片免看黄大片| 国产sm鞭打折磨调教视频| 中国体育生gary飞机| 国语第一次处破女| 国产精品久久久久久亚洲| 欧美熟妇另类久久久久久多毛 | 国产spa盗摄xo在线观看| 午夜成人理论福利片| 强开小娟嫩苞又嫩又紧视频播放| 精品人体无码一区二区三区| xxxx18一20岁hd第一次| 国产成人久久精品一区二区三区| 挺进同学熟妇的身体| 国产午夜精华精华精华| 亚洲国产AⅤ成人精品无吗| 美女视频黄a视频全免费网站| 最近免费观看在线中文2019| 久久久精品国产sm调教网站| 中文无码精品a∨在线观看不卡| 亚洲AV中文无码乱人伦在线播放| 日韩人妻无码一区二区三区免费 | 性色AV一区二区三区无码| 两女女百合互慰AV赤裸无遮挡| 婆岳同床双飞呻吟艳妇无边| 日本添下边视频全过程| 校草喝下春药被男生玩弄| 含羞草MYHANXIUCAO| 色拍拍在线精品视频| 亚洲第一综合天堂另类专 | 小sao货水好多真紧| 色欲人妻AAAAAA无码| 亚洲精品国产SUV一区88|