冷卻塔安裝要求

1.冷卻塔安裝要求

1. Installation requirements of cooling tower
(1)冷卻塔的安裝應根據(jù)設備的各種條件,考慮其安裝位置的地面及其荷載能力,同時也考慮外界條件。
(1) The installation of the cooling tower shall consider the ground and its load capacity at the installation location as well as the external conditions according to various equipment conditions.
(2)安裝時應注意冷卻塔的基礎按規(guī)定的尺寸預埋好水平鋼板,各基礎點的標高應在同一標高的水平面上。
(2) During installation, it shall be noted that the horizontal steel plate shall be embedded in the foundation of the cooling tower according to the specified size, and the elevation of each foundation point shall be on the horizontal plane of the same elevation.
(3)塔體應放置水平。水塔在施工安裝時,為防止壓壞底盤,施工人員應踏在底盤的加強筋上,在安裝塔外殼、底盤等纖維件時,為防止外殼底盤等變形可先穿螺釘,而后依次逐漸緊固,在確認底盤不變形,附近干凈、干燥的條件下,為避免使用時漏水可在接觸處鋪設纖維氈及涂樹脂。
(3) The tower body shall be placed horizontally. During the construction and installation of the water tower, in order to prevent crushing the chassis, the construction personnel should step on the reinforcing ribs of the chassis. When installing the tower shell, chassis and other fiber parts, in order to prevent the deformation of the shell and chassis, the screws can be threaded first, and then the screws can be tightened gradually. After confirming that the chassis is not deformed, and the surrounding area is clean and dry, the fiber felt and resin can be laid at the contact point to avoid water leakage during use.
2.冷卻塔本體安裝
2. Installation of cooling tower body
冷卻塔不得安裝在通風不良和出現(xiàn)濕空氣回流的場合,須安裝在通風良好的場所。否則將會降低冷卻塔的冷卻能力。冷卻塔一般安裝在冷凍站的屋頂上,以形成高壓頭,用以克服冷凝器的阻力損失。水泵將需要處理的冷卻水從水池抽出送至冷卻塔,經(jīng)冷卻降溫后從塔底集水盤向下自流壓入冷凝器中,并繼而靠水頭壓差自流入水池,如此循環(huán)。
The cooling tower shall not be installed in the place with poor ventilation and wet air return, but in the place with good ventilation. Otherwise, the cooling capacity of the cooling tower will be reduced. The cooling tower is generally installed on the roof of the refrigeration station to form a high-pressure head to overcome the resistance loss of the condenser. The water pump pumps the cooling water to be treated from the pool to the cooling tower. After cooling, it flows down from the water collecting tray at the bottom of the tower to the condenser automatically, and then flows into the pool automatically by the head pressure difference, so as to circulate.
安裝時,應根據(jù)施工圖指明的坐標位置就位,并應找平找正,設備要穩(wěn)定牢固,冷卻塔的出水管口及噴嘴方向、位置應正確。
During installation, it shall be in place according to the coordinate position indicated in the construction drawing, and shall be leveled and aligned. The equipment shall be stable and firm, and the direction and position of the water outlet and nozzle of the cooling tower shall be correct.

相關產(chǎn)品 我們的存在,是為了更好的服務于沼氣等可燃氣體凈化及利用行業(yè)
caoporn免费视频国产| 无人在线观看高清完整视频| 久久婷婷五月综合色国产香蕉| 精品无码av无码专区| 精品无码国产一区二区三区av| 无码精品人妻一区二区三区APP | 三个黑人上我一个述说| 小13箩利洗澡无码视频免费网站| 日本少妇高潮久久久久久| 国产亚洲精品无码成人| 免费网禁拗女资源网视频| japan高清日本乱xxxxx| 国产精品久久久久9999无码| 国模叶桐尿喷337P人体| 9制片厂制片传媒在线播放| 欧美人体艺术网| 青春禁区在线观看免费8| 最近最新的日本字幕MV| 性 色 国产 视频| 被老外添嫩苞添高潮np| 双乳被老汉玩弄A级毛片小说| 阿娇13分钟视频无删减MP4| 久久久久久无码av成人影院| 国产精品无码av天天爽播放器| 开到没人的地方要了我| 少妇性L交大片| 把腿张开抹春药调教男男| 成人美女黄网站色大免费的| 社保15年后每月拿多少| 久久泄欲网| 精品久久人人做人人爽综合| 欧洲精品久久久AV无码电影| 娇妻被朋友日出白浆H| 亚洲男同志网站| 国语自产精品视频在线区| 玩弄少妇人妻| 巨大巨粗巨长 黑人长吊| 久久人人妻人人做人人爽| 国产VA免费精品观看精品| 农场主三姐妹美国1976| 躺着把jiji向上摁平然后揉搓 |